or

Skip Navigation Links
Rental Car Center
RCC Packages
Skip Navigation LinksHome Business Opportunities North Side Development RCC Packages

FINISHES AND BALANCE OF WORK - Prequalification

  • Roofing
  • Doors/Framing
  • Traffic Coating/Resinous Flooring
  • Drywall/Insulation/Fireproofing
  • Acoustic & Metal Panel Ceilings
  • Composite Wall Panels & Metal
    Column Wraps
  • Resilient Flooring & Carpet
  • Terrazzo Flooring
  • Signage
  • Specialties
  • Interior Architectural Woodwork
    & Solid Surface Countertops
  • Landscape & Irrigation
  • Paintings & Coatings
  • Final Clean
  • Precast Brand Dividers
  • Decorative Concrete
  • Striping (Interior)
  • Fences and Gates
  • Tile

Bid Packages tentatively scheduled to release end of April or beginning of May 2014. Plans and specifications are not yet available.

Shortlisted Subcontractors have been selected for packages listed above. We are now seeking Tier-Subcontractors, Vendors, Suppliers, Professional Services Firms to assist shortlisted subcontractors to meet/exceed their SBE/DBE Goals noted on each bid package.

Please register and/or search bids at Register, Search & Submit On-Line Pre-qualification.

The Rental Car Center is being procured using a Best Value Scoring method enabling increased local and small/disadvantaged business participation. Procurement Process

The project team looks forward to the participation of the local subcontractor and supplier community throughout the course of the project. The A/S team is committed to maximizing opportunities for the smaller local firms. To meet this goal, A/S will be packaging the work into smaller scopes (where appropriate); as well as work with larger companies to reach out and mentor/team with smaller tier-subcontractors, vendors and suppliers. In this spirit, major trade contractors will be required to provide opportunity for local, small and disadvantaged firms to participate in the Best Value bid process. Phases/Packages and approximate time frames of release are listed below (subject to change):

Exterior Architecture
(Fall/Winter 2013)
Finishes and Balance of Work
(Spring 2014)
Award Pending prequal deadline 02.18.14 - Shortlisted Subcontractors Selected
Structural Steel
Metal Decking
Misc. Metals
Metal Stairs
Tensile Fabric Canopy
Decorative Metals/Railings
Roofing
Doors/Frames/Hardware
Traffic Coatings/Resinous Flooring
Drywall/Insulation/Fireproofing
Painting
Acoustical & Metal Panel Ceilings
Composite Wall Panels/Metal Column Wraps
Resilient Flooring & Carpet
Interior Architectural Woodwork &
Solid Surface Countertops
Terrazzo Flooring
Signage
Specialties
Landscape & Irrigation
Final Clean
Tile
PreCast Brand Dividers
Decorative Concrete
Striping
Fences & Gates
Roller Window Shades

 

Copyright 2011 San Diego County Regional Airport Authority. All rights reserved.